Nbbj image 2 banner1960x1080
NBBJ Uses Autodesk Insight to Achieve Milestone Toward Implementing Building Energy Models for Over 50 Percent of Projects

Autodesk tools help NBBJ stay on track with its AIA 2030 Commitment.

Aecom office image banner1960x1080
AECOM Beijing reduces modeling time by more than 2 months after Dynamo software integration

By introducing Dynamo to the team's workflow, AECOM Beijing won new work, improved its reputation, and saved time.

Enterprise hub1960x1080
Gilbane cuts project time by 66 percent using VR models and pre-fab building

The Gilbane Building Company faced a tough deadline for the Wentworth Institute of Technology’s new science lab. The number of pipes and other features was roughly quadruple that of average projects. With many elements and only 15 months to comple...

32 33
SNC-Lavalin’s Atkins business uses BIM 360 Design to maximize global design resources on a major Singapore metro project

Working closely with Autodesk, Atkins implemented BIM 360 Design (formerly Collaboration for Revit) on its second high-profile metro project in Singapore. By giving its international design team access to up-to-date project files, BIM 360 Design h...

003043 00 n21 letter %282%29
CannonDesign uses Autodesk Navisworks to redefine the role of clash detection

To minimize the need for costly, time-consuming changes to design and construction documents, CannonDesign began using Navisworks to perform routine clash detection earlier in the design and construction process.

Affordable housing   kenya
Autodesk BIM 360 helps Atkins to provide key clients in East Africa with easy access to project and design data

Atkins implemented BIM 360 on two key projects in East Africa to give clients simple, mobile access to up-to-date project and design information.

Picture1
SNC-Lavalin's Atkins business builds automation into standard business processes

Through collaboration with Autodesk, SNC-Lavalin's Atkins business has developed a portfolio of automated design tools which significantly improves efficiency and make schemes-wide options assessment and value engineering at project inception a re...

Screen shot 2018 02 26 at 4.18.27 pm
Tetra Tech delivers 24MGD water treatment plant $15M under budget and saves a year of construction time by leveraging 3D modeling strategy

Tetra Tech utilized 3D modeling to design a better product and drive customer satisfaction.

Screen shot 2018 02 14 at 1.58.29 pm
Schneider Electric leverages Moldflow to reduce product time to market by 50 percent

In an effort to minimize the length of the customer's product lifecycle, Autodesk is working with Schneider to shorten pre-production, enhance staff knowledge and productivity, and maximize its use of Moldflow products.