AECOM reduces project time and cost with BIM 360 family of products

When AECOM was facing challenges with project delivery time and cost, Autodesk helped the company implement BIM 360 Glue and Field, as well as BIM 360 Design, quickly and without disrupting existing workflows.

01 main image
CannonDesign + NEUF architect(e)s deliver first phase of CHUM, the largest healthcare project in North America, using Revit and Navisworks

Set in the heart of Montreal, the new Centre hospitalier de l'Université de Montréal (CHUM) is changing...

Dura vermeer
Dura Vermeer saves approximately 5% on costs per project following BIM 360 implementation

By aligning people, process, standards, and Autodesk technology, Dura Vermeer experienced significant cost savings of approximately five percent per project.

Collaboration for revit
AECOM leverages Collaboration for Revit to realize 20 percent time savings on global collaboration

By implementing C4R late into a 24-week project, AECOM was able to save time, enhance productivity, and complete the project on schedule.

Screen shot 2017 12 01 at 3.07.10 pm
BAM uses Point Layout to navigate design challenges on the V&A Museum of Design Dundee

Every wall of the V&A Museum of Design Dundee is curved: sometimes both horizontally and vertically.

Men vs machine achtergrond
Heijmans saves $100,000 during first two months of Dynamo usage

At Heijmans, a number of initiatives to implement BIM (Building Information Modelling) already existed as part of a company-wide BIM approach. Autodesk has now...

Skanska at au keynote
Skanska USA leverages virtual reality to win five out of six new projects

With a goal of increasing its win rate for new projects, Skanska engaged Autodesk to help its Tampa-based Preconstruction unit develop a technological differentiator. Working closely with members of the Tampa office, Autodesk leveraged VR to creat...

A360 collaboration for revit desk
Beca reduces project time by 33 percent with BIM 360 Design

By implementing BIM 360 Design, Beca was able to reduce the project’s duration by a third—and, ultimately, to meet a project’s challenging design deadline by taking full advantage of the time zone span between New Zealand and Indonesia.